Every forecast date, critical path and float value depends on the quality of the underlying schedule. Controls Star assesses CPM integrity against an industry-informed methodology — then shows the scheduler exactly what to fix first.
Open ends and constraints distort total float, so the finish date the schedule reports may not be the date the logic actually supports.
When the network isn't fully tied together, the 'critical path' can jump between updates — and steer reviews at the wrong work.
A clean-looking Gantt can hide a schedule that can't survive the first change. Decisions get made on numbers that won't hold.
Hours spent hunting for what changed and why — instead of deciding what to do about it.
Each check runs against your uploaded XER and rolls up into weighted categories. The score isn't a black box — every check shows what it found, what it's compared against and how much it costs the score.
Controls Star simulates resolving each group of issues and recomputes the score, so the scheduler sees which corrections recover the most quality — not just a long list of everything that's wrong.
The result is a prioritised punch-list a scheduler can work top-down, with the highest-value corrections first.
A single project score can hide a discipline that's dragging the schedule down. Controls Star re-runs the attributable checks by WBS or discipline so teams can see where the issues are concentrated — and flags critical-path and network impact.
| Discipline | Index | Critical | Warning |
|---|---|---|---|
| Pipe | 61 | 4 | 7 |
| Electrical | 69 | 2 | 5 |
| Structural Steel | 82 | 0 | 3 |
| Concrete | 88 | 0 | 1 |
On data center, power and industrial programs, a schedule that can't be trusted is measured in millions.
Controls Star applies its own scheduling-quality methodology and weighting, informed by widely used industry scheduling guidance for CPM assessment. Every check documents what it measures, its population and the source thinking behind it — so the score is defensible and repeatable, not a black box.
Controls Star is an independent product. It is not certified, endorsed, sponsored or approved by GAO, DCMA, NASA, NDIA or any standards body. References describe the industry guidance that informs our methodology.
Upload a P6 XER — or explore the sample project — and see the Schedule Quality score, checks and highest-value fixes in the same session.