Schedule Quality

Can you trust the schedule you're making decisions from?

Every forecast date, critical path and float value depends on the quality of the underlying schedule. Controls Star assesses CPM integrity against an industry-informed methodology — then shows the scheduler exactly what to fix first.

Controls Star · Schedule Quality
72
Overall Schedule Quality Score
Fair — review before relying on forecast dates
Logic and constraint issues are limiting how far the finish date can be trusted.
Critical Issues
5
Warning Issues
12
Accepted
3
Representative assessment shown for illustration.
Why it matters

A schedule can look finished and still be unreliable.

Forecast dates you can't defend

Open ends and constraints distort total float, so the finish date the schedule reports may not be the date the logic actually supports.

An unreliable critical path

When the network isn't fully tied together, the 'critical path' can jump between updates — and steer reviews at the wrong work.

False confidence at the steering committee

A clean-looking Gantt can hide a schedule that can't survive the first change. Decisions get made on numbers that won't hold.

Wasted review time

Hours spent hunting for what changed and why — instead of deciding what to do about it.

What Controls Star checks

The checks behind the score.

Each check runs against your uploaded XER and rolls up into weighted categories. The score isn't a black box — every check shows what it found, what it's compared against and how much it costs the score.

96.4%
Network Integration
of activities in the main network
38
Missing Logic (Open Ends)
activities missing predecessor/successor
17
Hard Constraints
MSO / MFO constraints applied
9
Negative Float
activities driving negative float
24
Long Durations
activities over the duration threshold
3
Data-Date Violations
actuals / forecasts crossing the data date
82.1%
Relationship Types
FS or accepted relationships
6
Out-of-Sequence Progress
activities progressed against logic
Logic
71
weight 25%
Constraints
64
weight 20%
Float
78
weight 20%
Durations
83
weight 15%
Data & Status
88
weight 10%
Critical Path
74
weight 10%
Where to start

It doesn't just find issues.
It ranks the fixes.

Controls Star simulates resolving each group of issues and recomputes the score, so the scheduler sees which corrections recover the most quality — not just a long list of everything that's wrong.

The result is a prioritised punch-list a scheduler can work top-down, with the highest-value corrections first.

Controls Star · Highest-Value Fixes
Recommended fixScore recovery
1.Add missing logic to 38 open-ended activities+8.4
2.Review 17 hard constraints controlling the completion date+5.1
3.Resolve negative float on the driving path+3.2
4.Reduce long-duration activities without interim milestones+1.6
Recoveries are simulated independently and are not additive.
Where problems concentrate

Trace quality down to the discipline.

A single project score can hide a discipline that's dragging the schedule down. Controls Star re-runs the attributable checks by WBS or discipline so teams can see where the issues are concentrated — and flags critical-path and network impact.

Controls Star · Quality Index — Discipline
DisciplineIndexCriticalWarning
Pipe6147
Electrical6925
Structural Steel8203
Concrete8801
Rows of server cabinets inside a data center hall nearing completion
Built for high-stakes schedules

On data center, power and industrial programs, a schedule that can't be trusted is measured in millions.

Methodology

Informed by industry guidance. Transparent by design.

Controls Star applies its own scheduling-quality methodology and weighting, informed by widely used industry scheduling guidance for CPM assessment. Every check documents what it measures, its population and the source thinking behind it — so the score is defensible and repeatable, not a black box.

GAO guidanceDCMA guidanceNASA guidanceNDIA guidance

Controls Star is an independent product. It is not certified, endorsed, sponsored or approved by GAO, DCMA, NASA, NDIA or any standards body. References describe the industry guidance that informs our methodology.

Find out what your schedule is really telling you.

Upload a P6 XER — or explore the sample project — and see the Schedule Quality score, checks and highest-value fixes in the same session.