Controls Star · Performance by Discipline
DisciplineCPI · Planned / Earned / Spent
Concrete1.04
Structural Steel1.01
Civil / Earthwork0.93
Electrical0.90
Pipe0.82
PlannedEarnedSpent
Illustrative discipline profile — not actual customer results.
Discipline Level Breakdowns

Find the discipline behind the variance.

A healthy project number can hide a trade that's quietly going off track. Controls Star breaks performance down by discipline so teams see where hours are being lost — and act before it spreads.

The blind spot

The overall project can look fine while one discipline goes off track.

Averages hide problems. Strong performance in Concrete or Steel can mask a discipline burning hours faster than it earns them. Controls Star compares planned, earned and spent by discipline so the trade behind the project-level variance is visible.

Civil is burning more hours than planned.
Pipe is falling behind earned progress.
Steel is tracking well while Concrete deteriorates.
Electrical performance is masking an otherwise healthy project.

Scenarios above are illustrative, not actual sample-project conditions or customer results.

By trade

Performance in the language of the field.

Planned vs earned vs spent

Per-discipline progress and cost, side by side, so pressure is obvious.

Cost & labor performance

Where CPI, SPI and labor performance concentrate by trade.

Concentrated issues

The single trade most responsible for the project-level variance.

Structural steel frame being erected against a bright sky
Large-diameter process piping runs at an industrial facility
High-voltage electrical substation transformer and buswork

Focus corrective action where it matters.

Explore the sample project, then upload your own data to compare performance by discipline.