Controls Star · Cost Performance
BACdata date
Planned costActual costForecast (EAC)
CPI
0.91
EAC
$1.21B
VAC
−$96M
Representative cost profile shown for illustration.
Cost Performance

See cost drift before it becomes the forecast.

Cost problems rarely arrive all at once — they drift. Controls Star reads the signals in the data you already track, so deterioration shows up while there's still room to protect the forecast.

What it surfaces

Where the money is actually going.

Cost variance

Where actual cost is running against the value of work earned.

Forecast position

EAC and VAC — where the project is trending against the approved budget.

Discipline exposure

Which trades are carrying the cost pressure, not just the project total.

Deteriorating areas

Where cost efficiency is slipping fastest and deserves attention first.

What it is

Performance insight, not a new accounting system.

Controls Star doesn't replace your ERP or cost ledger. It reads the cost and progress data your team already produces and turns it into a performance signal project controls can act on — the drift, the forecast and where it's concentrated.

The value is time

Catching cost drift earlier means more room to respond — recover scope, rebaseline, or brief leadership before the number is fixed. The earlier the signal, the cheaper the response.

Refinery process towers and a tall crane against a warm dusk sky during construction

On large capital projects, the forecast is a promise. Cost drift is how it quietly breaks.

Protect the forecast while you still can.

Explore the sample project, then load your own cost data to see where performance is drifting.

Optional Analytics & Advertising

Learn More