Frequently Asked
Project Controls & Primavera P6 FAQ
The questions procurement teams ask before they adopt Controls Star — answered.
Do you support Primavera P6?
Yes. Upload your P6 XER export directly and Controls Star parses activities, predecessors, WBS phases, and float. You get critical-path narratives, driving-activity exposure, baseline-drift tracking (when you upload the contract baseline separately), and per-scope critical paths on the exports.
What data does Controls Star need to generate insights?
At minimum: an Excel or CSV progress file with columns for discipline, planned hours, earned hours, and spent hours per data date. That alone unlocks CPI, SPI, EAC, VAC, and AI-generated recommendations. Add a Primavera P6 XER to unlock schedule health, critical paths, and baseline-drift analysis.
How is this different from Procore or a spreadsheet?
Procore is a construction management platform focused on document/RFI/submittal workflows. Controls Star is purpose-built for earned value management and project controls insights — CPI/SPI trends, critical-path narrative, discipline-of-concern actions, and executive board-pack exports. If your team already lives in a spreadsheet, we replace 4–8 hours of manual reporting per week with an automated deck that reads the same file.
Can I use hours instead of dollars?
Yes — hours is the primary unit. Cost view is opt-in per project. Most labor-heavy projects work in hours and only surface dollars for executive summaries.
How do I re-baseline mid-project?
Open the Update Progress modal on any project. To correct historical progress, just re-upload your Excel/CSV — snapshots update in place, and any cell you leave blank preserves the previously recorded Planned/Earned/Spent value (no wipe or reset required). If the CONTRACT baseline was formally re-baselined, attach the new P6 XER via the 'Approved baseline' picker in the same modal — Controls Star tracks slippage vs the baseline you upload, not vs day-1 estimates.
What does the AI actually do?
The AI reads your KPIs, discipline breakdown, and P6 schedule health together and writes: (1) an executive summary that tells the story instead of restating numbers, (2) 3-5 non-obvious findings (trend inflections, downstream risk chains, milestone leverage), (3) 3-5 concrete this-week actions with expected leverage, and (4) per-discipline weekly-focus guidance. It's advisory, not narrative — it won't tell you 'CPI is 0.85' because you already see that on the KPI cards.
How often should I refresh data?
Weekly is the sweet spot for construction projects — matches most owner reporting cadences and gives the AI enough delta to surface trend inflections. Daily is supported (helpful for high-velocity commissioning phases). Monthly works but you'll miss early warning signals.
Do you offer bulk imports or an API?
Bulk Excel/CSV imports are supported today. A programmatic API is on the roadmap — reach out via /contact if you need it prioritized.
How much does it cost?
Project tier is $500/month for one active project and up to 2 team members. Program is $2,000/month for up to 5 active projects and includes 10 team members, portfolio analytics and priority support. Enterprise pricing is customized for larger organizations. See the Pricing Page for current plan details.
Can I try it before buying?
Yes — use the 'Try with your data' flow at /try to run a full analysis on an anonymized copy of your own data before you subscribe. Takes about 60 seconds if you have your Excel or XER ready.
Still have a question?
Get an answer within one business day.