Sample Project
Utah Power · Salt Lake City, Utah, United States · Data Centers

Data Center Sample

PM: Michael Cain · Disciplines: 12 · Data Date: 2026-08-22
At Risk

Schedule Quality

Can this P6 schedule be trusted as a technically reliable CPM schedule?

100
Excellent
Can I trust this schedule?

Technically reliable — the network, logic and status checks support forecast dates.

Top Executive Actions

  1. 1.

All scored metrics pass. The schedule scores 100 (Excellent) with 2 review-level items.

Overall Score
100
Critical Issues
0
Warning Issues
0
Accepted Exceptions
0

Category Scores

Select a category to focus the quality checks below.

Quality Checks

The individual checks that make up the Schedule Quality Score.

Showing:All Categories

No problem metrics — all scored checks pass.

Highest-Value Fixes

What should the scheduler fix first?

1.Review 2 Startup / Commissioning / Turnover high float activities Review+0.2

Where are the problems concentrated?

Top 5 most concerning areas. Click a row to open its issues.

WBSQuality IndexCriticalWarningMain DriverImpact
Startup / Commissioning / Turnover9700High Float
Construction10000
Procurement10000
Engineering10000

Advanced Diagnostics

Additional CPM health indicators that do not affect the Schedule Quality Score.

Controls Star Schedule Quality Methodology v1.0 · Methodology informed by GAO, AACE, NASA, and DCMA scheduling guidance. · Generated 2026-09-19 18:37 · Controls_Star_Data_Center_120MW_30_Month_Current_Schedule_Gold_Standard_v2.xer